Release 10.1A: OpenEdge Development:
Progress Dynamics Administration


Sequence Control window

You use the Sequence Control to define any sequences that you reference in your application. As described in the previous section, these sequences are automatically defined in and generated from one of the two Repository databases, depending on your Repository configuration.

To define sequences, choose System Sequence Control from the Administration tool’s menu bar. This opens the Sequence Control window, as shown in Figure 4–1.

Figure 4–1: Sequence Control window

Like most control windows installed with Progress Dynamics, it contains a single browse that controls access to the records of a query, in this case, records that define gapless sequences and reference numbers for use in your application. You can use the toolbar at the bottom of the control window (a standard TableIO toolbar) to add new records or to delete, copy, edit, or view a currently selected record. Any add, edit, or view function opens the Sequence Maintenance window, with fields initialized and displayed according to the selected row and function (default values for an add record).


Copyright © 2005 Progress Software Corporation
www.progress.com
Voice: (781) 280-4000
Fax: (781) 280-4095